Skip to content
AVENLOPlan a pilot
Hazardous access robotics

Send the machine in first.

Avenlo maps, inspects, and documents hazardous infrastructure before your crew crosses the line.

Human-controlled missionsTraceable field record
LIVE FIELD / AV-042Route clear
N 47° 19' 08"ELEV. −12.4 MF-02
SiteNorth conduit / sector C
Traversed1.84 km
Findings03 marked

The first inspection should not be the dangerous one.

Confined spaces, unstable structures, and unknown air quality force teams to choose between delayed answers and unnecessary exposure.

Before entryUnknown
After surveyMapped
  • Unknown conditions

    Crews enter before the site is fully mapped.

  • Scattered evidence

    Photos, notes, and sensor readings live in separate files.

  • Slow decisions

    Specialist access turns one question into a multi-day wait.

One mission. Three coordinated passes.

A compact robot crew builds one shared record of the site. Open a pass to see what the operation receives.

MISSION LOG / AV-042 / 08:14
1SurveyBuild the navigable site model.

LiDAR, thermal, and gas readings are registered against the same route.

OutputSpatial map
2InspectRevisit every priority asset.

The crew adapts its formation around access limits while operators retain mission control.

OutputCondition record
3Hand offTurn findings into field-ready work.

Every marked issue carries a location, reading, image, and review state.

OutputAction brief

A field record, not a folder of robot footage.

Avenlo is built around the decision your team has to make after the robot returns.

Inspect a field note
ROUTE / C-14Linked
01
Shared coordinates

Every reading points to the same place.

02
Human command

Operators approve route changes and critical actions.

03
Open handoff

Export a clear record for engineering and maintenance teams.

What the field team sees when a mission closes.

We reviewed the flagged span before the access crew arrived. The morning started with a plan, not a search.

Mara ChenIntegrity lead, Northline Water
FIELD NOTE / 01

One route gave operations, engineering, and the contractor the same evidence. That changed the handoff completely.

Jon BellSite manager, Vale Junction
FIELD NOTE / 02
Closed mission
Mission recordAV-042
Route coverage1.84 km
Evidence points126
Review stateSigned
Reviewed / MC

Built for the review after the run.

Every mission preserves the route, sensor source, operator decision, and final sign-off in one traceable record.

IEC-ready workflowRole-based reviewSource-linked evidence
01Mapped route
02Timestamped readings
03Operator interventions
04Export history

Questions before a pilot.

Does Avenlo replace our inspection team?

No. It gives your specialists a mapped first look and a better record. Your team keeps control of decisions and sign-off.

What environments can the robots enter?

The fictional Scout Array is presented for industrial conduits, galleries, tunnels, and utility spaces. A real deployment would require a site-specific safety review.

How does mission control work?

An operator sets the boundary, watches the route, and approves critical changes. The system records every intervention with the mission evidence.

Can the findings fit our existing process?

The concept supports structured exports for engineering review and maintenance planning. Integration details would be defined during a real pilot.

Draw the safe line before anyone crosses it.

Bring one difficult route. We will map the pilot around the answer your team needs.

Plan a pilot